Power Transmission Equipment Corp. v. Beloit Corp. (1972)

The complete opinion body was retrieved and independently reviewed on October17,2026 from the cited unofficial host (CAP report copy or Justia-hosted filed court PDF); no summary substitutes for the opinion.

Source note (2026-10-18):

  • Links on this page to https://static.case.law/wis-2d/55/cases/0540-01.json are an (unofficial Caselaw Access Project copy, retrieved before 2026-10-18; host disallows automated access); no official or otherwise permitted full-text copy was located on 2026-10-18.

Facts

Forgings were delivered to Beloit for machining, and Beloit advanced freight charges. The owner sought replevin while Beloit also demanded payment on an unrelated account.

Holding and reasoning

A consignee need not receive goods for sale to have the former289.44 lien (now779.44). An excessive demand made in good faith and ignorance of lien scope did not by itself waive the lien or dispense with a proper tender; tender of the secured amount would require surrender.

Practical limits

The court did not adjudicate purchaser discharge or priority against a perfected third-party lender. Its rejection of an unpreserved constitutional attack on the then-replevin procedure is not current certification of every old procedural rule.

Good-law status

Historical holding verified. Comprehensive later treatment remains needs_verification; current statutory annotation is not a complete citator. This assurance question is separate from verification of the reported holding.

Rechecked 2026-10-18 (CourtListener citation search; results retained in schema/verification/wisconsin-evidence-2026-10-18/): later citing decisions located are out-of-state opinions (for example Nevada 2018, Third Circuit 1999, Maine 1996) cited on the tender doctrine; no later Wisconsin decision was located and none was read in full. § 779.44 is unchanged. Not a commercial citator check.

Applies in

wisconsin